Trackwork Continues

2024-10-06T18:57:52+11:00

More progress in the yard today as the team finished installation of more replacement sleepers, serviced the points to the loco and carriage roads and the catch points on the through road. We then started to cleanup the splintered remains of sleepers that have been removed over the past few months. It's a big job, but the team are doing some great work and we're making some good progress. It's also great to see some of the amazing mechanical engineering in action with the signal and interlocking system. (and yes, we know that we weren't using a rag and [...]

Trackwork Continues2024-10-06T18:57:52+11:00

Project Update – VW Quad

2024-09-03T22:12:35+10:00

After being entirely stripped down, sand blasted, repaired and painted, our volunteers have now started to re-assemble the vehicle. Fresh decking boards have been installed while the wheels and brake system have also been put back together. It's taken a while to get to this stage but the result is looking amazing. 🙌 With a few more body pieces to attach, the restoration of the body and running gear will be complete, and our volunteers can turn their attention to the motor. Unfortunately, the motor isn't looking as good as the rest of the vehicle and requires a complete [...]

Project Update – VW Quad2024-09-03T22:12:35+10:00

Project Update – MBC22959 Interior

2024-08-18T18:26:18+10:00

With the exterior restoration complete, our volunteers have been focusing on the interior restoration of MBC22959 and it's looking amazing! We've been able to retain the patina of the side walls which have been cleaned and sanded, ready for oiling while the timber roof has been stripped, repaired and painted. The sheet metal at the ends which housed the ice blocks are slowly being cleaned and repaired, with small amounts of sheet metal being replaced to remove rust and replace missing parts. Most recently, the team have been working on the installation of the new timber floor which is [...]

Project Update – MBC22959 Interior2024-08-18T18:26:18+10:00

Project Update – Tennis Court Restoration

2024-08-18T18:20:29+10:00

The restoration of the Cooma Railway Institute Tennis Courts is starting to take shape. The transformation has been exciting to watch and the surface is starting to look amazing. 🤩 Originally constructed in 1928 from Ant Hills or Termite Mounts, the courts are almost 100 years old and were built for the railway workers at Cooma and their families. As part of the Cooma Railway Institute restoration, a new retaining wall has been constructed between the oil siding above, new fencing has been installed around the courts, services have been reconnected to the toilet block, and a completely new [...]

Project Update – Tennis Court Restoration2024-08-18T18:20:29+10:00

Snowy Hydro Community Grant – Institute Building Fitout

2024-08-11T18:12:33+10:00

Thanks to the support from Snowy Hydro and their Community Grants Program, we've been able to fit out our newly restored Railway Institute Building with some much needed equipment.The facility is now equiped with a 75-inch touch screen display and a high definition video conferencing system which is perfect for hosting meetings and training sessions.Once the restoration of the building is complete, the facility will provide a much needed meeting and training venue for our local community. We look forward to sharing it with everyone soon!

Snowy Hydro Community Grant – Institute Building Fitout2024-08-11T18:12:33+10:00

Rail Safety Week

2024-08-11T18:21:50+10:00

This week is Tracksafe National Rail Safety Week where we raise awareness of our railways to help keep everyone safe, especially in regional areas like Cooma. Unlike many other railways, the railway corridor at Cooma has only recently become active again after a period of inactivity which can result in people assuming that trains won't be operating and potentially putting themselves into a situation where they might be in danger. This includes cars at road level crossings and pedestrians crossing the tracks. We would like to remind everyone to take care around the railway corridor and Expect the Unexpected. [...]

Rail Safety Week2024-08-11T18:21:50+10:00

Work Continues – Stop block installed at Snowy Junction

2024-06-08T14:33:59+10:00

Our track crew continued their work on the railway corridor with a new temporary stop block and stop sign installed before the missing crossing on Polo Flat Road at Snowy Junction. The team also cleared the vegetation around the section. While work continues on getting the level crossing reinstalled, this will be our northern limit of operation for the short term. It was great to see so many people waving and stopping again. It's really heartening to have so much community support and it really motivates our team to keep working hard to get our trains running again. -------------- [...]

Work Continues – Stop block installed at Snowy Junction2024-06-08T14:33:59+10:00

Track Machine to Snowy Junction

2024-05-26T18:25:00+10:00

With the commencement of operations and the repairs to the Yareen Road Level Crossing completed, one of our track teams were able to complete an installation run out to Snowy Junction (as far as the Polo Flat Road Level Crossing) to clear vegetation and assess the current state of the railway infrastructure. It was extremely exciting to see railway vehicles back out on this section of line and it was great to see so many people waving and watching as we travelled along. It's amazing to see so much local support and it means so much to our volunteers. [...]

Track Machine to Snowy Junction2024-05-26T18:25:00+10:00

Rail Operations Commence

2024-06-10T21:22:57+10:00

We are extremely proud to announce that railway operations have re-commenced on the Cooma to Snowy Junction section of railway line, and our railway maintenance vehicles will be traversing this section from Saturday 25th May 2024. This week saw a significant milestone for CMR and an exciting time for everyone who has worked so hard to get to this point. Firstly, our inaugural group of Track Machine Operators successfully completed their training and are now qualified to operate our track maintenance vehicles. These volunteers have been working towards these qualifications for several months and we're so proud to see [...]

Rail Operations Commence2024-06-10T21:22:57+10:00

Yareen Road Level Crossing Repairs

2024-05-26T17:41:54+10:00

A big thank you to the team from UGL Regional Linx who completed the repair work on the Yareen Road Level Crossing. After completing road surface repairs earlier in the year, the team returned today to cut the flange gaps back into the crossing, allowing our trains cross the road and continue on to Snowy Junction. The team has done a great job, and the crossing is looking amazing after all the work that has been completed over the past several months. 👉 If you are travelling on Yareen Road, please slow down as you approach the crossing and [...]

Yareen Road Level Crossing Repairs2024-05-26T17:41:54+10:00